Print Page Share

Search

 Home  > Search  > sewer
Narrow Search Results

 
« prev 1 2 3
Demolition Guidelines Sewer Repair Guidelines Site Development Guidelines Slabs, Stoops, & Stairs Guidelines Solar Photovoltaic (PV) System Guidelines Temporary Heating Equipment Guidelines Temporary Tent Guidelines Temporary Trailer Guidelines Tree Preservation Building Plan Requirements Tree Protection Fencing Requirements Utility Easement Encroachment Letters Water Heater Guidelines Well Guidelines   FAQ Air Conditioner Noise. Can the City do anything about a neighbor’s air
More like this
flat work Installation of siding in excess of one hundred (100) square feet Deck, porch, stair or stoop construction or replacement Installation of or alteration to an elevator Exterior door or window replacement or installation involving structural changes Addition to, alteration, replacement or relocation of any standpipe system, water supply, plumbing, sewer, drainage, gas, soil waste, vent or similar piping, electrical wiring, heating, air conditioning, or other mechanical components
More like this
; The budget reflects that progress.  We will be repaving more streets, planting more trees, and lining more sewers than we have in previous years, as well as advancing on our parking challenges that we face in this area of town.     I want to highlight one construction project that has already begun and is not costing the City of Park Ridge a thing.  The State of Illinois is repaving Talcott from border to border – helping a much needed
More like this
 
« prev 1 2 3
 
33 Results Found

Filter by Type

Filter by News Categories

Filter by Faq Categories

 
 
Park Ridge Home Page
Park Ridge City Hall, 505 Butler Place, Park Ridge, IL 60068|Directions|847-318-5200|Hours: Mon - Fri: 8:00am - 5:00pm
©2019 City of Park Ridge. All Rights Reserved. | Web site design and development by Americaneagle.com